A new window looking out on the pool: the opening framed, the window set and wrapped, then trimmed out, with the floor kept covered the whole time.
Same wall, two days apart


Step by step
Work done: A new window opening in a finished room: the opening framed, the window set and wrapped in house wrap, then drywall. We finished the interior trim around it with the floor covered the whole time.
01 Opening framedJun 17, 2025 02 Window set, house wrapJun 17, 2025 03 DrywallJun 19, 2025 04 Trimmed outJul 10, 2025Notice the floor: still fully covered.